**CHALLENGE**


Expand the production capacity of a bottling plant.

Several years ago, after discovering a high-quality water source in Bronchales, we played a key role in establishing the Bronchales mineral water bottling plant. With increasing demand in the bottled water industry, the plant needed to scale up production. To achieve this, they required a new water source that matched the exceptional quality and abundant flow of the original well.

**THE PROJECT**


By tracing the main water vein that runs through the area—initially identified during the original well’s drilling—we determined the ideal location for a new well that would not interfere with the existing water supply. We also identified two additional drilling points for future expansion.

The well was drilled successfully, and the drilling team reported that, prior to our involvement, multiple attempts at finding a suitable water source had failed due to insufficient flow or poor water quality.

**SOLUTION**


The new well, once drilled and tested, confirmed a steady flow of 30 liters per second, with the required water quality. This ensures that the plant can meet growing demand and expand its production capacity without compromising the original well’s output.

 

DEPTHS

From 260 to 290m

FLOWS
From 90 to 110m3/h

WATER SORT

Mineral Natural

NUMBER OF WELLS

1